CV

Family Name: Murăraşu Given Name(s): Ioan
Date of Birth: August 8, 1951 Nationality: Romanian
Phone Number: (0040)341 801 367 / (0040)728 877 391
E-Mail Address: This e-mail address is being protected from spambots. You need JavaScript enabled to view it.

Profession

Foreman, specialized in:
Ship building and repairing, steel work, soft steel, manilindrical nozzles, donkey boilers, coolers, heat exchangers, fittings

 

Educational Background:

1980 - 1982 Technical school: mechanic foreman for construction and industrial tools
1965 – 1969 Technical school: mechanic

Professional experience:

1969 – 1972 Steel work mechanic at the Construction Trust Carpati
1973 – 1982 Steel work mechanic specialized in pipes for industrial plants at Industrial Construction Trust Constanta, Installations Group
1982 – 1990 Foreman at IMN Constanta, specialized in:

  • Construction of all types of boilers for romanian shipping industry
  • Gas boilers
  • Boilers for tank ships from 15 to 40 steam tons
  • Boilers with heaters from Q 0,750 to Q 15 tons
  • Heat exchangers
  • Condensers, coolers

1990 – 1992 Chief foreman at T.C.M.R.C. Bucharest (Constantza shipyard), specialized in pipes for boilers and industrial vats.
1992 – 1994 Chief foreman at S.C. VERINAV S.A.
1994 – 2002 Chief foreman at SC THERMAR SA Constantza, specialized in:

  • Ship repairs
  • Boiler repairs, including sluicing and water washing, brickwork and isolation
  • Condensers, coolers

2003 – December 2005 Chief foreman Germanicher Lloyd Offshore - Hamburg

  • Assisting / supporting/ supervising the Pipe Shop in layout /
  • Arrangement and organization.
  • Assisting / advising/ supervising
  • To apply / use the NSWE data base for manufacturing the pipes, modules and units.
  • Training the Pipe Shop staff on pipe fabrication checking and testing;
  • To advise, supervise and assist in Pipe System Installation incl. all components
  • Testing/Commissioning/Quay – Dock and Sea trails.

Jan 2006 - Nov 2006 - SC Tehnav Term SRL - technical Director

  • specialized in pipes for boilers and industrial vats

since Nov 2006 - Sc Murcos Term Srl - technical director

  • all my experience was transferred in a family business

 


Major works:


1982 – 1996 1 invention and 13 patented innovations (7 are used at this time) in the field of cupping and twisting of kerfs, pipes and plates:

  • Pipe bending machine: from F 25 to F 60 mm, R=1,5 DN
  • Process for making pipe bends by extrusion (R<1,5 mm DN)
  • Device for making pipe coils (R<1,5 DN)
  • Device for beveling plates
  • Device for beveling pipes
  • Machine for bending pipes, metallic and aluminum profiles for ship doors and window frames
  • Machine for bending pipes for accessories for Alborck boilers
  • Machine for rolling plates for thickness between 1 – 8 mm, max width 2 m
  • Machine for rolling plates for thickness between 8 – 25 mm, max width 2,5 m

1992 M/N HAGIENI (7800 TW): supervising foreman on:

  • Repairs on a gas boiler (90 sq.m.)
  • Repairs of a boiler (Q=1 steam ton): brickwork and isolation.
  • Steel work (12 tons)
  • Soft steel
  • Replacements on the pipes for hatch covers hydraulic system

1992 M/N SALAJ (7800 TW): supervising foreman on:

  • Repairs on a gas boiler (90 sq.m.)
  • Repairs of a boiler (Q=1 steam ton): brickwork and isolation.
  • Steel work (13 tons)
  • Soft steel
  • Replacements on the pipes for hatch covers hydraulic system
  • Repairs on the main engine and diesel generator, pumps, valves

1992 M/N RAZBOIENI (15000 TW): supervising foreman on:

  • Repairs on a gas boiler (90 sq.m.)
  • Repairs of a boiler (Q=1 steam ton): brickwork and isolation.
  • Steel work (12 tons)
  • Soft steel
  • Pipe replacements on a condenser (12,5 sq.m.)

1993 M/N FIERBINTI, HUSI, FRUNZANESTI (7800 TW) : supervising foreman on:

  • Repairs on a gas boiler (90 sq.m.)
  • Repairs of a boiler (Q=1 steam ton): brickwork and isolation.
  • Steel work (30 tons)
  • Soft steel
  • Repairs on the main engine and diesel generator, pumps, valves
  • Replacements on the pipes for hatch covers hydraulic system
  • Pipe replacements on a condenser (12,5 sq.m.)

1993 M/N SULINA (4700 TW): supervising foreman on:

  • Pipe replacements on a gas boiler (90 sq.m.)
  • Repairs of a boiler (Q=1 steam ton): brickwork and isolation.

1993 M/N BORZESTI, BOBALNA, BORSEC (65000 TW): supervising foreman on:

  • Repairs of a boiler (Q=3,5 steam ton): brickwork and isolation.
  • Repairs on a gas boiler (1200 sq.m.)
  • Pipe replacements on three condenser (12,5 sq.m.)
  • Pipe replacements on 3 coolers (24 sq.m.)
  • Steel work (aprox. 30 tons /ship)
  • Soft steel
  • Replacements on the pipes for hatch covers hydraulic system

1994 M/N SAMARINA 1, SAMARINA 2, GORGOVA (7800 TW): supervising foreman on:

  • Pipe replacements on a gas boiler (90 sq.m.)
  • Repairs of a boiler (Q=1 steam ton): brickwork and isolation.
  • Repairs on the main engine and diesel generator, pumps, valves
  • Soft steel
  • Pipe replacements on three condenser (12,5 sq.m.)

1994 M/N CALLATIS (65000 TW): supervising foreman on:

  • Repairs of a boiler (Q=3,5 steam ton): brickwork and isolation.
  • Repairs on a gas boiler (1200 sq.m.)
  • Pipe replacements on three condenser (12,5 sq.m.)
  • Pipe replacements on 3 coolers (24 sq.m.)
  • Steel work (aprox. 30 tons /ship)
  • Soft steel
  • Replacements on the pipes for hatch covers hydraulic system

1995 M/T BANAT, M/T DACIA (85000 TW): supervising foreman on:

  • Repairs of a boiler (Q=3,5 steam ton): brickwork and isolation.
  • Pipe replacements of an anabatic boiler (Q=30 steam ton), super heater

1995 M/T LIBERTATEA (150000 TW): supervising foreman on:

  • Repairs of a boiler (Q=3,5 steam ton): brickwork and isolation.
  • Pipe replacements of an anabatic boiler (Q=30 steam ton), super heater

1996 M/N ALBA (8700 TW) in Mobile, Alabama, US: supervising foreman on:

  • Pipe works in machine room and on deck
  • Replacements of a gas boiler
  • Pipe replacements on a heat boiler (Q=1000 mc)
  • Soft steel works: repairs on store rooms covers, frameworks, deck and storerooms ventilation

1996 M/T MUNTENIA (85000 TW): supervising foreman on:

  • Repairs of a boiler (Q=3,5 steam ton): brickwork and isolation.
  • Pipe replacements of an anabatic boiler (Q=30 steam ton), super heater

1997 M/N CAPE SUNION (65000 TW) & M/N LIVEZENI (25000 TW) in Victor Lenat shipyard, Riyeka: supervising foreman on:

  • Pipe repairs in engine room and on deck
  • Soft steel works : repairs on hatch covers, deck and storerooms ventilation, doors
  • Modified driving system on store rooms covers with a new chain with steel cable
  • Repairs of a boiler (Q=3,5 steam ton): brickwork and isolation.
  • Repairs on a gas boiler (1200 sq.m.)
  • Pipe replacements on a condenser (12,5 sq.m.)

1997 M/N TARGU FRUMOS & TARGU SECUIESC (18000 TW): supervising foreman on:

  • Pipe replacements on a gas boiler (125 sq.m.)
  • Repairs of a boiler (Q=2 steam ton): brickwork and isolation.
  • Steel work (40 tons/ship)
  • Soft steel
  • Repairs on hatch covers

1998 M/T JEROME (150000 TW): supervising foreman on:

  • Pipe repairs of 2 boilers (Q=40 steam ton): brickwork and isolation.
  • Pipe replacements on a condenser (20 sq.m.)
  • Replacements of steam pipelines on a cargo tank

1998 M/N TARGU LAPUS & CAMPULUNG MOLDOVENESC (18000 TW): supervising foreman on:

  • Pipe replacements on a gas boiler (125 sq.m.)
  • Repairs of a boiler (Q=2 steam ton): brickwork and isolation.
  • Steel work (40 tons/ship)
  • Soft steel
  • Repairs on hatch covers

1999 – 2000 M/T IRINA (150000 TW): supervising foreman on:

  • Pipe repairs of 2 boilers (Q=40 steam ton): brickwork and isolation.
  • Pipe replacements on a condenser (20 sq.m.)
  • Replacements of steam pipelines on a cargo tank

1999 – 2000 M/N SALVA & VISEU (25000 TW): supervising foreman on:

  • Pipe repairs of 2 boilers (Q=2,5 steam ton): brickwork and isolation.
  • Pipe replacements on a gas boiler (125 sq.m.)
  • Steel work (125 tons)
  • Soft steel works: repairs on store rooms covers, frameworks, deck and storerooms ventilation

2000 M/T BANAT (85000 TW): supervising foreman on:

      • Pipe replacements on a vaporizer and economizer

2000 M/T CAPE ATHOS (65000 TW): supervising foreman on:

  • Repairs of a boiler (Q=3,5 steam ton): brickwork and isolation.
  • Repairs on a gas boiler (1200 sq.m.)
  • Pipe replacements on condenser (12,5 sq.m.)
  • Pipe replacements on a cooler (24 sq.m.)
  • Steel work (aprox. 220 tons)
  • Soft steel
  • Replacements on the pipes for hatch covers hydraulic system

2001 M/N RO/RO (65000 TW): supervising foreman on:

  • Replace of a boiler (Q=2 steam ton): brickwork and isolation.

2001 M/T CHAMPION TRAIDER (35000 TW) (in march from Bangkok to Singapore): supervising foreman on:

  • Pipe replacements on a SUNOROD boiler (25 steam tons)
  • Pipe replacements on deck steam (corrosion-proof) 25 square-meters, including brickwork and isolation

2001 M/T Zafiro Producer (350000 TW), Malabo island: supervising foreman on:

  • Repairs on a Nebraska boiler rated stm. cap. 75.000 lb/hr:
      • Replacements on 30% of the pipes
      • Full brickwork repairs and isolation
      • Replacement of a rare gas generator and steam steel
  • Repairs on a Alabama Type service boat: replacement of 40% of aluminum work

2002 M/T CANDENIZ (12000 TW): supervising foreman on all repair works, except dock works.

  • Repairs of a boiler (Q=3,5 steam ton): brickwork and isolation.
  • Repairs on a gas boiler (1200 sq.m.)
  • Pipe replacements on condenser (12,5 sq.m.)
  • Pipe replacements on a cooler (24 sq.m.)
  • Steel work (aprox. 20 tons)
  • Soft steel
  • Replacements on the pipes for cargo tanks

2002 M/N FIFI F: supervising foreman on:

  • Repairs of a boiler (gas side = 32,1 sq.m., oil side = 1,2 sq.m.): brickwork and isolation.

2002 M/N STANDARD VALOR (165000 TW): supervising foreman on:

  • Repairs of a boiler (Q=3 steam ton): brickwork and isolation.
  • Repairs on a gas boiler (1200 sq.m.)
  • Pipe replacements on condenser (12,5 sq.m.)
  • Pipe replacements on a cooler (24 sq.m.)
  • Steel work (aprox. 220 tons)
  • Replacements on the pipes for hatch covers hydraulic system

2002 M/N DIGNITY (165000 TW): supervising foreman on:

  • Pipe replacements on a condenser (20 sq.m)

Since June 2003 – December 2005 - 5 Container Vessel – 2200 TEU – ISOICO – Shipyard – Republic Islamic of IRAN

  • Training, advising and supervising for manufacturing and mounting the pipes for Container Vessel 2200 TEU;
  • Preparing more than 80 devices and tools for manufacturing (e.g. bending, welding, changing the tools and devices for bending machines, marking of center of pipes, etc.) and mounting of pipes on modules, units, section and berth erection;
  • Technology, devices and manifold for checking and hydrostatic testing all the pipe line;
  • Preparing more then 30 devices and tools for manufacturing the Cu Ni Fe pipes (e,.g. – lapped, etc.)
  • Technology, devices and manifold (including tank) for cleaning with phosphate of pipe lines;
  • For Shop Centers (Fabrications of Piping, Electrical, Electronic, Modules and Units Fabrications, Locksmith) estimating the man power, flow chart for arrangement and organization with equipments, devices, tools, etc.
  • Arrangement and Organization the Fabrication of Piping Shop/Outfitting Shop Mechanical / Modules and Units Fabrication Shop/ Outfitting Electrical Electronic and Automation Shop/Locksmith and Lofting Shop/ Berth Erection Install Pipes System Testing.